Reduce fuel waste without losing service
Compare maintenance timing, operating changes and vehicle allocation. Keep the delivery obligation in the decision alongside the expected saving.
Reduce fuel and energy waste while maintaining service. SupraOS compares operating changes, directs the work across fleets or sites, and measures fuel and energy use against the operating baseline. Verified operating evidence informs the next decision.
10,000 litres over 40,000 km
Keep the planned route coverage
Four days committed elsewhere
The fleet or site owner, with the responsible maintenance authority.
Maintained service and a measured reduction under comparable operating conditions.
Explore the plan yourself, or play the walkthrough. Change the capacity, commitments or result record to test what happens.
Interactive demo · fictional data · no live connections.
One route group has elevated fuel intensity. Maintenance and operating changes compete with workshop work required to keep other vehicles in service.
Compare maintenance timing, operating changes and vehicle allocation. Keep the delivery obligation in the decision alongside the expected saving.
Connect the meter signal to equipment schedules, occupancy or production. Compare approved operating changes and the maintenance they require.
Compare equivalent distances, loads and output, then repeat the measurement to confirm the efficiency improvement.
Bring a defined operation, baseline records and the owner who can approve a change. Agree the required service, available maintenance capacity and the measurement conditions before the work begins.
Begin with the relevant records and agreed permissions. Expand from an outcome whose work, cost and result can be inspected.
Discuss a fuel or energy outcomeThe owner-accepted fleet record covers 118 vehicles, a 90-day baseline and a 31-day post-change period. The normalized intensity reduction is measured; annual fuel, cost and emissions savings are estimates.
Read the Climate Charters recordInspect the measurement methodOne SupraOS: identify the opportunity, choose across competing commitments, create what is missing, direct the work and verify the result. The evidence and capabilities carry into the next decision.
It is the fuel and energy application of SupraOS: operating evidence, a better plan, approved corrective work and checked savings.
Normalized fuel intensity fell 8.1% across 118 vehicles over 31 days, measured against a 90-day baseline. Annual savings are projections from that measured reduction.
No. The interactive examples and calculator show how the decision and arithmetic work. A deployment uses its own operating records, measurement method and accepted result.
Tell us the commercial priority or where progress has stalled. We’ll identify the first opportunity, the work it needs and how success will be verified.